Items where Year is Not Specified

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type | No Grouping
Number of items: 2.

MASYHURI, MUHAMMAD ADIB LAPORAN MAGANG 2 EVALUASI BUDAYA KERJA PEMELIHARAAN DAN PERBAIKAN DENGAN METODE 5R PADA POOL DAMRI CABANG BANDUNG. Project Report. POLITEKNIK KESELAMATAN TRANSPORTASI JALAN, TEGAL. (Submitted)

RAFIANSYAH, ALIF TAHAPAN PENGECATAN DASAR (PRIMER PAINTING) BODY BUS LEGACY SR3 DI PT. LAKSANA BUS MANUFAKTUR. Project Report. POLITEKNIK KESELAMATAN TRANSPORTASI JALAN TEGAL, TEGAL.

This list was generated on Tue Apr 7 23:05:02 2026 WIB.